home > case studies list > technology space - level 3


 
:: Level 3 ::
 
 
• Location:
Chiswell Street, London EC1
 
• Project Manager: CitySpace Group Ltd
• Interior Design: CitySpace Group Ltd
• Form of Contract:
Exchange of letters
• Project Area: 2,500 sq ft
• Project Value:
£150,000 excluding active equipment
• Contract Period:
4 weeks
• Project Details:

CitySpace worked with the client’s Facilities Department in the technical design
and specification for this switch centre.

• Scope of Works:

CAT B fit out.
- Strip Out
- Provision of a New 100% Back-up Air-conditioning System
- Provision of UPS
- Power and Data Cable Management
- Gas suppression Systems
- Anti-static Floor Finishes
- Decoration
- Partitions
- Tea-point
- Dual power supplies and racks
- Co-ordination of Active Equipment Move
- Security - CCTV, Alarms
- Standby generator