|
Location:
|
The
Pavilion, Thames Ditton, Surrey
|
|
|
Project
Manager:
|
Stuart
Edwards Fullermoon
|
| Agent: |
Stuart
Edwards Fullermoon |
|
Quantity
Surveyor:
|
Anthony
J Silver Associates
|
|
Form
of Contract:
|
JCT
1998 Management Contract
|
| I.T.: |
CitySpace
Group Ltd co-ordinated |
|
Project
Details:
|
Cat
B tenants fit out to new building.
Original design work developed under a D&B contract.
CitySpace
offered alternative proposal
at tender stage to switch to a fee based GMP contract.
|
|
Scope
of Works:
|
Mechanical Adaptation
- Power Distribution
- Re-designed Lighting Layouts
- CCTV
- Security System
- AV Presentation Suite
- Demountable Partitions
- Decoration
- Carpet
- Tea Points
- Data Cabling
- Network Equipment
- Joinery
- Furniture
- Filing and Accessories
|
|